← Back to interactive checklist
District of Columbia Opening Checklist (Printable)
Print-friendly checklist with statewide baseline and municipality-specific notes.
State section — District of Columbia
- District of Columbia health/public health program
- State or delegated fire authority
- Local building and planning departments
Washington, DC legality flow (exact order)
- Register business + tax accounts (DC Business Portal/OTR) and confirm Clean Hands readiness.
- Verify zoning/use and occupancy path with DOB before full design spend.
- File DOB building/trade permits and C of O pathway as needed for scope.
- Submit DC Health food establishment plan/license requirements and complete corrections.
- Complete fire/life-safety approvals (DOB + FEMS where required), then pass final inspections.
- Secure final operating licenses (DLCP, food, alcohol/public-space if applicable) before opening.
Required document packet
- Entity/EIN, OTR registration, lease + landlord authorization
- Coordinated stamped plan set (architectural/MEP/equipment/grease/hood)
- Menu + process narrative, certified food manager records, contractor insurance/licenses
- Commissioning and acceptance test records for ventilation, suppression, and utilities
- Final approvals binder: occupancy, health, fire, and operating license postings
Ward-relevant practical notes
- Wards 1/2/6: plan early for alcohol and public-space processes tied to nightlife/patio operations.
- Wards 3/4: older mixed-use buildings can trigger shaft, grease-line, and make-up-air redesigns.
- Wards 5/7/8: verify utility capacity and interceptor requirements before final TI budgeting.
- All wards: ANC/community timelines can affect alcohol/public-space scheduling.
Filing offices + official directory
Opening task checklist
| Done | Task | Owner | Date |
|---|---|---|---|
| Zoning/use verification complete | __________________ | __________ | |
| Plan review package submitted | __________________ | __________ | |
| Health/building/fire permits issued | __________________ | __________ | |
| Final inspections passed | __________________ | __________ |
Notes
Signature: ________________________
Date: ________________________